★ Service · Flooring & Carpet ★Underfoot, done properly —

Flooring & carpet

Hard-wearing floors and automotive carpet cut for campervans. An insulated build-up underneath, a finish that takes wet boots and sandy dogs, and trims that stop the edges lifting six months in.

From£150
KentBuilt in Ramsgate
Vinylor carpet
6moWarranty
Wetboots welcome
★ What's included

Floor up, finished properly

✓

Insulated subfloor

Battened and insulated so the cold stops at the metal.

✓

Vinyl & lino

Hard-wearing, wipe-clean, and warm underfoot over ply.

✓

Automotive carpet

Stretch-fit carpet for walls, arches and load areas.

✓

Wheel arch trimming

Wrapped and bonded so there's no exposed edge to catch.

✓

Threshold trims

Aluminium edging at the doors where floors take the beating.

✓

Cut-to-van kits

Templated and supplied loose if you're fitting it yourself.

★ How it works

Templated, laid, trimmed

Same five stages on every build. No mystery, no moving goalposts.

From the workshop floor —
1
2
3
4
5

Enquire

Day 1

Tell us the van and the finish.

Template

Day 1

Floor pattern taken off the van.

Estimate

Day 1

Fixed price, materials included.

Lay & trim

Day 1

Subfloor, covering, edges.

Back to you

Day 1

Walk on it the same day.

★ What it costs

Priced by floor area

★ Flooring from
£150

The starting point for a straightforward floor in a typical SWB. Insulated build-ups, carpet-lined walls and arches are estimated alongside once we've seen the van.

What moves the number

Van sizeSWB → LWB / high-top
Floor build-upCovering only → insulated
MaterialVinyl, lino or carpet
Supply or fitCut kit or fitted
We estimate what it costs.
★ Quick answers

Flooring FAQs

Straight answers. If yours isn't here, the workshop phone gets answered by the people on the tools.

01Vinyl or carpet — which should I have?

Vinyl on the floor, carpet on the walls and arches, for most people. Vinyl takes wet boots and mops clean; carpet is warmer and quieter but holds sand and dog hair. Plenty of builds use both.

02Is the floor insulated?

It can be, and we'd recommend it. An insulated build-up costs a little more and a lot less cold comes up through the floor in February.

03Will it take a swivel seat or a rock-and-roll bed?

Yes — tell us at estimate stage. Anything bolting through the floor needs the build-up planned around it, and load spreaders where the fixings land.

04How long does it take?

A floor is usually a day, or two with a full insulated build-up and carpeted arches.

★ Didn't find your answer? ★

Ask the workshop →
★ Our promise · written down

What we commit to on this job

Four things we hold to on every floor.

— from the workshop floor
  • 01
    Templated to the van

    Cut off your floor pan, so no gaps at the arches or the step.

  • 02
    Edges finished properly

    Trims at the thresholds and bonded arches — nothing left to lift.

  • 03
    Built up for the cold

    Insulated subfloor where you want it, not just a covering laid on metal.

  • 04
    Planned around fixings

    Tell us about swivels and beds and we spread the load before we lay.

★ Next step

Get the floor down

Floors are quick, and they're the thing you notice every single day. Tell us the van and how you'll use it — muddy boots, boards, dogs, all of it.